{"id":6769,"date":"2024-07-24T09:42:00","date_gmt":"2024-07-24T07:42:00","guid":{"rendered":"https:\/\/trebes.mainet.care\/?p=6769"},"modified":"2026-05-11T08:15:36","modified_gmt":"2026-05-11T06:15:36","slug":"new-pedestrian-and-cycle-bridge-over-the-tungendorfer-graben-in-neumuenster","status":"publish","type":"post","link":"https:\/\/trebes.mainet.care\/en\/neue-geh-und-radwegbruecke-ueber-den-tungendorfer-graben-in-neumuenster\/","title":{"rendered":"New pedestrian and cycle bridge over the Tungendorfer Graben in Neum\u00fcnster"},"content":{"rendered":"<p>In the industrial area of Neum\u00fcnster, Dr. Langness Grundst\u00fccks GmbH &amp; Co. KG wanted to optimize its storage area. In order to connect the properties with each other, the existing shortcut and connecting road \"Meynwischseegen\" had to be partially relocated.<\/p>\n\n\n\n<p>We were commissioned with the project and structural planning as well as the construction supervision for a bridge structure that crosses the Tungendorfer Graben at the appropriate location.<\/p>\n\n\n\n<p>To construct an attractive and durable structure, we opted for a single-span steel superstructure (span width 7 m), supported on two reinforced concrete support beams. The roadway is designed as a steel deck plate with a thin sanded surface.<\/p>\n\n\n\n<p>The subtle shade of gray, together with the stainless steel handrail, gives the bridge a high-quality, modern appearance that blends in well with the natural surroundings.<\/p>\n\n\n\n<p><a href=\"https:\/\/trebes.mainet.care\/en\/project\/walking-and-cycling-bridge-over-the-tungendorfer-graben-in-neumuenster\/\" data-type=\"projekt\" data-id=\"3991\">Further information on the project<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Im Industriegebiet Neum\u00fcnsters wollte die Dr. Langness Grundst\u00fccks GmbH &amp; Co. KG ihre Lagerfl\u00e4che optimieren. Um die Grundst\u00fccke miteinander zu verbinden, musste der vorhandene Abk\u00fcrzungs- und Verbindungsweg \u201eMeynwischseegen\u201c teilweise verlegt werden. Wir wurden mit der Objekt- und Tragwerksplanung sowie der Bau\u00fcberwachung f\u00fcr ein Br\u00fcckenbauwerk beauftragt, welches an der passenden Stelle den Tungendorfer Graben quert. Zur [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":3992,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-6769","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"acf":[],"_links":{"self":[{"href":"https:\/\/trebes.mainet.care\/en\/wp-json\/wp\/v2\/posts\/6769","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/trebes.mainet.care\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/trebes.mainet.care\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/trebes.mainet.care\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/trebes.mainet.care\/en\/wp-json\/wp\/v2\/comments?post=6769"}],"version-history":[{"count":2,"href":"https:\/\/trebes.mainet.care\/en\/wp-json\/wp\/v2\/posts\/6769\/revisions"}],"predecessor-version":[{"id":9189,"href":"https:\/\/trebes.mainet.care\/en\/wp-json\/wp\/v2\/posts\/6769\/revisions\/9189"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/trebes.mainet.care\/en\/wp-json\/wp\/v2\/media\/3992"}],"wp:attachment":[{"href":"https:\/\/trebes.mainet.care\/en\/wp-json\/wp\/v2\/media?parent=6769"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/trebes.mainet.care\/en\/wp-json\/wp\/v2\/categories?post=6769"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/trebes.mainet.care\/en\/wp-json\/wp\/v2\/tags?post=6769"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}